files/MDTB-GBR490x110-Sept-2014.jpg files/redtails.gif
GoBlueRidge.Net
High Country News, Weather, and Bulletins
HCR WSOC TV NCNN
files/auto-banner-2014.gif

Todays ForecastToday:
40°F | 67°F | %
Tomorrows ForecastTomorrow:
46°F | 65°F | %
  Swap Shop Online
Home Weather Classifieds Jobs Real Estate Autos
Google gets bigger PDF Print
Written by Lauren Ohnesorge   
Sunday, 24 June 2007 19:24
Google’s original construction plans for the Lenoir site have expanded.
The e-business, which is building a large data center of N.C. 18 between Harrisburg Drive and Virginia Street, is making some changes to the original plans. The size of the data center currently under construction is much larger than originally thought, stretching from N.C. 18 along Harrisburg Drive toward Overlook Drive. A second construction area, located above the site and linked by a bridge, is currently being prepped for development. The original plan included an estimation of 210 new jobs. No word on if the expanded plans will bring even more job opportunities.
Prev Article In This CategoryNext Article In This Category
Prev ArticleNext Article
 
Share This Article:
Facebook Twitter Pinterest Email

files/Carolina-Panthers.gif
files/goheels.gif
files/appstatemountaineers.gif
files/whs_pioneers.gif
files/Avery-Vikings.jpg